| SUMMARY OF WILD TROUT HABITAT RESTORATION WORK CARRIED OUT ON THE RIVER TAF FECHAN TO DATE | AS AT:- 05/10/04 | ||||||||||||||||||||||||||||||
| Location | Overhead | New Wooden/ | River Banks | M/c. excavations | Introduction | Introduction of | Miscelaneous work carried out relating to the Taf Fechan | ||||||||||||||||||||||||
| Ref. No. | Canopy | Boulder Weirs | Rebuilt and/ | To the River Bed | of Spawning | Trees/cuttings | and details of specific restoration work at particular locations | ||||||||||||||||||||||||
| On Taf | Removed | Constructed | or reinforced | or River Banks | Gravels | (Willows) | to rectify/overcome specific degraded habitat problems/issues | ||||||||||||||||||||||||
| Fechan | RH | Bank | LH | RH | Bank | LH | RH | Bank | LH | RH | Bank | LH | |||||||||||||||||||
| Bridge | Trout redd confirmed by E/A at tail of pool above bridge Dec. '03. | ||||||||||||||||||||||||||||||
| 1.5 | |||||||||||||||||||||||||||||||
| Willow Logs secured to the Toe of the L.H. bank to establish | |||||||||||||||||||||||||||||||
| a soft engineering revetment to protect the bankside and road- | |||||||||||||||||||||||||||||||
| way from further erosion during very high winter river flows when | |||||||||||||||||||||||||||||||
| Pontsticill Reservoir is overflowing. - April 2004 | |||||||||||||||||||||||||||||||
| 2 | Electro-fished by E.A. July 2004. - Results very encouraging. | ||||||||||||||||||||||||||||||